• Laboratory Testing

    Asbestos Disassembly and Audit with Hazardous Substance Audit
    Air Measurement Services

    MORE
  • Water and
    Environment

    HSE Engineering offers complete solutions both to private sector and public institutions. . .

    MORE
  • Waste Management

    Water Treatment Station, Waste Water Treatment Station, Waste Incineration Station, Waste Disposal and Management

    MORE
  • Asbestos Measurement

    The studies of asbestos survey and inventory preparation are run by professional personnel according to the regulations set up by European Union and local authorities.

    MORE
  • Planning and
    Audit

    The audit of disassembly and cleaning of asbestos is run in accordance with VDI 3866, TRGS 519 and “Regulations related to health and safety precautions in studies with asbestos”. The necessary activities carried out accordingly are shortly as following:

    MORE

Planning and Audit

The audit of disassembly and cleaning of asbestos is run in accordance with VDI 3866, TRGS 519 and “Regulations related to health and safety precautions in studies with asbestos”. The necessary activities carried out accordingly are shortly as following:

  • • The audit inspecting if the disassembly and sterilization studies are run in accordance with VDI 3866, TRGS 519 and “Regulations related to health and safety precautions in studies with asbestos”.
  • Making a plan of daily activities to be carried out at the area of assembly, at the commencement of work.
  • Auditing the activities the assembly company is supposed to carry out during the commencement of work and the completion, and equipment in use.
  • During the process of assembly, enabling the necessary health and safety precautions to be taken in order to protect the polluted area and its environment with asbestos.
  • When the job is completed, auditing if the legal values are exceeded or not by inspecting and measuring the air.
  • Keeping a report of daily activities and making a record of measurement results taken in the ambient air.
  • Taking necessary precautions in case of a possible inconvenience either at the commencement or completion of work.
  • At the completion of the work, handing out all the documents (daily reports, air measurements, health reports and lung x-rays of the employees) to the clients in a condition available to be kept for 40 years.